Our Team members' Achievements

Altusvia Energy Corporation is a manufacturer of Solar Panel
Lead, direct and deploy a 0.5 million dollar project. Scope of responsibilities include User Requirements survey, plan for the solution architecture, control and monitoring the execution of the project, and closure of the project.
The project was delivered on time, to the expected specification, and within budget.


Spansion Inc. Japan is a Flash Memory Chip Maker
Establish the requirement survey team; Lead and direct User Requirement Survey for the Front End 300mm wafer FAB MES solution. The goal of the MES project is to provide Spansion with the ability to track, trace, and manage product throughout the factory. Key functionalities include management of Furnace Monitor lots and NPW (Non-Production Wafer) handling techniques. The ability of define process plan, and manage materials provide the foundation for a manufacturing facility to deliver significant production controls.
The requirement team played critical role in bridging the development team and key stakeholders (both internal and external), hence a major contributor to the success of MES deployment.


UMC is founded in 1980, as Taiwan's first semiconductor company, and is the foundry technology leader.
Design and develop PRP (Process Plans), WIP (Work In Progress) modules within MES Frameworks (FACTORYworks 3); Leads and direct User Requirement Survey, as well as the Solution Architecture for the Front End 300mm wafer FAB MES solution.
The goal of the MES project was to provide UMC with the ability to track, trace, and manage product throughout the factory. Key functionalities include management of Furnace Monitor lots and NPW (Non-Production Wafer) handling techniques. The ability of define process plan, and manage materials provide the foundation for a manufacturing facility to deliver significant production controls.
The MES is integrated with EAP, MCS system in accomplishing FULL AUTOMATION capability.


The Biosensors International group of companies develops, manufactures and markets innovative medical devices for interventional cardiology and critical care procedures.
Led and conducted requirement surveys across multiple functional groups in Biosensors. Scope of responsibilities included User Requirement surveys, planning for the solution architecture, and provided a full documentation of the end-to-end process Business Process Blueprint (BPB). Obtained Sign-off from Key Users within 8 weeks.
Emphasized on FDA Part 11 software requirements that included Route Sheet, electronic Device History Records, double signatures, and software validations.